Update README.md
Browse files Browse the repository at this point in the history
  • Loading branch information
akimrx committed Mar 9, 2024
1 parent 2754399 commit 733b405
Showing 1 changed file with 25 additions and 0 deletions.
25 changes: 25 additions & 0 deletions README.md
Original file line number Diff line number Diff line change
Expand Up @@ -35,6 +35,31 @@ Sometimes he has to go to a lot of endpoints to collect what needs to be taken t
- Issue changelog (i.e the history of all the events that occurred with the task)
- Calculated issue metrics by status (i.e. the time spent in a particular status)

### Cycle time calculation algorithm

Currently, status metrics are calculated based on the transition between statuses (based on issue changelog). The counting algorithm will be improved.

Let's imagine that the task can be, for example, only in 5 statuses:

- Open
- In progress
- Testing
- Ready for release
- Closed

Employees start working on the task, the history of the task and the actions of employees is described below, with a correlation to the work of the exporter.

1. A new task has created with the initial status `Open`, metrics are not counted.
2. The developer has taken the task to work, the transition is `Open -> In progress`, the metric for the `Open` status has been calculated, while the current status `In progress` is not yet considered.
3. The developer has submitted the task to testing, the transition `In progress -> Testing`, the metric for the status `In progress` has been calculated, while the current status is being `Testing` is not yet considered.
4. QA Engineer returned the task for revision, the transition `Testing -> In progress`, the time in the status `Testing` has been calculated, the status `In progress` has the previous metric and has not changed yet.
5. The task has been finalized, re-submitted to testing, the transition `In progress -> Testing`, the delta of this transition is added incrementally to the previous value of the metric `In progress`, but `Testing` has not changed yet.
6 The task has been tested and submitted for release, the transition `Testing -> Ready for release`, the delta of this transition is incrementally added to the previous value of the metric `Testing`, the `Ready for Release` status is not considered yet.
7. The release is completed, the task is closed, the transition `Ready for release -> Closed`, the metric for the `Ready for Release` status is considered. **The metric of the final status (`Closed`) of this task will not be (re)calculated.**

#### Planned improvements
Consider the status metric if a transition has been made to it, even if such a status is current and the next transition has not yet been made from it. Exclude the final statuses from the innovation.

## Tech stats

> Metrics based on 100,000+ constantly changing production issues
Expand Down